Leave the flooring in the room for three days before installation.
Installing laminate flooring on concrete floor.
This will help to acclimate the flooring to the room temperatures and humidity.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
Laminate flooring is ready to install as long as the base floor is clean and smooth.
For the next plank join the short end of the plank first image 2.
Determine how much flooring and materials will be needed.
Add about 10 to that number to account for any possible mistakes and warped boards.
Fix concrete subfloors with a patching compound and for wood subfloors remove protruding nails and replace any damaged boards.
Multiply length times width of the room.
Remove any carpet or other flooring.
Insert the tongue of the second row plank into the groove of the first row plank at a slight angle until the laminate edges meet.
To prepare the foundation concrete floor for laying laminate you will need.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
Next use a back saw to cut the wooden door jamb by holding it perfectly level.
A plastic roller with spikes.
Work with great care otherwise you might scratch the jambs.
How to lay laminate flooring on concrete.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Next rotate down until the joints lock image 1.
After removing the existing flooring baseboards and quarter moulding check that the subfloor is solid flat and clean.
Install a plastic vapor barrier.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
You will see a gap on the long side joints when the plank is rotated down.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
A container for solution.